Fairbanks Booster Pump station and CV-01 Repair
Mining & MineralsThis remote location project included civil, concrete, structural steel, equipment installation, piping and electrical work to construct a new booster pump station—all self performed by Phoenix Industrial.The work was completed in two separate shutdowns in order to minimize operational downtime.Phoenix also delivered on a critical repair scope needed for an existing 130’ tall stacker conveyor. These repairs were performed around the clock and included new foundations, temporary shoring and new structural steel to replace a failing support bent.